Christchurch Cardboard Cathedral

Christchurch Cardboard Cathedral

type of project
Commercial
Project location
Christchurch Central
Project size
5001m2 – 10,000m2
Roles that canzac played in this project
Product Recommendation and Supply

Project Challenge

While the concrete finish is important, curing is critical. There is a small window to cure the slab and let the concrete get to its strength and eliminate early shrinkage cracks.

The Canzac Solution

Ultracure NCF Wet Curing Blanket.

The Benefits & Results

UltraCure curing blanket left down for 7 days increases concrete strength and durability, reduces early plastic shrinkage cracking dusting and efflorescence, so this provides good strong concrete, not flaky and dusty.

No items found.

got a project you need advice on

Contact Us

You’ll get the best advice, world class products and systems and solutions you can rely on.

Contact us

The largest range in Australasia

Canzac Products

From load transfer, formwork, lifting systems , joint control , densifiers , joint fillers, and the list goes on..