Archives New Zealand - Department Of Internal Affairs

Archives New Zealand - Department Of Internal Affairs

type of project
Commercial
Project location
Wigram - Christchurch
Project size
5001m2 – 10,000m2
Roles that canzac played in this project
Consultation
Construction
Design
Product Recommendation and Supply

Project Challenge

A new build with a floor area of approximately 1960m2, single level facility that requires a high standard of humidity and temperature controlled environments. Historically, buildings that demanded the same critical environments were constructed slabs-on-grade with joints, which either did or could affect the internal enclosure.

The Canzac Solution

At the early planning stage, CANZAC was engaged to provide a solution by the developer. Along with the lead design engineers, a Joint Free Slab design was proposed based on the slabs loading requirements that featured a shelf, along with loading under all the wheels combined.

We provided a design that allowed for a 140mm thick slab joint free, no saw cuts or control joints with a 50mm thick screed on top.

The Benefits & Results

The result is a jointless slab that has STEGO vapour barrier life of the building protection underneath, allowing for superior below slab defence that eliminates the infiltration of moisture through the concrete slabs, which is a significant building defect liability.

No items found.

got a project you need advice on

Contact Us

You’ll get the best advice, world class products and systems and solutions you can rely on.

Contact us

The largest range in Australasia

Canzac Products

From load transfer, formwork, lifting systems , joint control , densifiers , joint fillers, and the list goes on..